Plant down? +49 33766 212 449 Groß Köris · Brandenburg and Upper LusatiaDeutsch
PLC data backup

Yesterday's version, when nothing works today.

Program data, visualisations and inverter parameters backed up and archived, so a plant can be brought back to the state it was in before the failure.

Laptop with programming software connected by cable to a Siemens PLC in the control cabinet

The program only exists on the control itself.

In plants that have grown over the years, that is normal. The colleague who programmed the control retired long ago, there is no documentation, and the only current program version is in the device. If it fails, the program goes with it.

A PLC backup costs a fraction of what it costs to reconstruct a lost program. Assuming it can be reconstructed at all.

Scope

What is backed up.

Backing up PLC program data

Creating and archiving the program data, from Siemens STEP5 through STEP7 to TIA Portal, for quick recovery in the event of a fault.

Operator panels

Backup of visualisation projects and configurations. After a replacement, a panel without its project is just a screen.

Frequency inverters

Backup and documentation of the parameters, for Siemens as well as Lenze, so recommissioning works without readjustment.

When it matters

Between standstill and restart lies a single file.

If an assembly is faulty and gets replaced, the backup decides whether the plant is producing again in hours or in days. With a current program version the replacement is routine. Without it, reconstruction begins, and that takes time.

That is why the backup does not belong on the list of things to do some day, but at the very start.

In practice

Ideally when we are there anyway.

A new backup should be made after every change to the program. In practice this is easy to combine with appointments that are due anyway: the DGUV Regulation 3 inspection or preventive maintenance.

After a breakdown call-out is also the right moment, because something in the program often changes during it.

Questions

Questions about PLC data backup.

Isn't our IT department's backup enough?

Usually not. Control programs, panel projects and inverter parameters are not stored in the company network's file system, but on the devices themselves. A normal server backup does not capture them.

How often should backups be made?

After every change to the program. A backup that is two modifications old is of limited help in the event of a fault, because it no longer reflects the current state of the plant.

What exactly is backed up?

The program data of the controls from Siemens STEP5 through STEP7 to TIA Portal, the visualisation projects and configurations of the operator panels, and the frequency inverter parameters, for Siemens and Lenze alike. Everything is archived and documented, so that after a faulty module has been replaced the plant can be recommissioned without readjustment.

Can you do this during an appointment that is planned anyway?

Yes. If we are on site anyway for the DGUV V3 inspection, a thermography survey or other maintenance, the backup can be done in the same appointment. That saves a separate trip. You get an up-to-date backup without needing an extra appointment.

Related services

Tell us what you need.

Not a sales pitch, but a technical assessment. For acute breakdowns please call directly, it is faster.